Electrical Panel Schedule Template

Electrical Panel Schedule Template

The Electrical Panel Schedule form is a crucial document used to outline the distribution of electrical circuits within a building's electrical panel. It provides essential information about each circuit, including its amperage, voltage, and the specific areas or equipment it serves. Understanding this form helps ensure safe and efficient electrical system management.

Open Electrical Panel Schedule Editor Now

The Electrical Panel Schedule form is an essential tool for anyone involved in electrical work, from contractors to homeowners. It serves as a detailed guide that outlines the distribution of electrical circuits within a building. This form typically includes critical information such as the circuit number, the load capacity, and the specific areas or equipment each circuit powers. By clearly mapping out the electrical system, the schedule helps ensure safety and compliance with local codes. Additionally, it can assist in troubleshooting and maintenance by providing a quick reference to the electrical layout. Understanding how to read and fill out this form is crucial for effective electrical management, making it a key resource in both new installations and renovations.

Electrical Panel Schedule Sample

Panel Schedule

General Information

Panel ID

Panel Location

Fed From

Breaker Details

Main Breaker

Main Lugs Only

Fed-thru Lugs

 

Phase Type

Voltage Type

 

Amps

Single Phase

120 / 240

120 / 208

 

Three Phase

277/ 480

120 / 240

 

 

 

Brkr

Pole

Wire

Pipe

VA

Voltage

Description

Ckt

Ckt

Description

Voltage

VA

Pipe Size

Wire Size

Pole

Brkr

 

 

(AWG)

Size

 

 

 

 

 

 

 

 

 

(AWG)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

1

2

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

3

4

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

5

6

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

7

8

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

9

10

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

11

12

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

13

14

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

15

16

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

17

18

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

19

20

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

21

22

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

23

24

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

25

26

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

27

28

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

29

30

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

31

32

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

33

34

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

35

36

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

37

38

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

39

40

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120 / 240

 

41

42

 

120 / 240

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Notes

1)All Electrical Works Shall Be Done In Accordance With The Approved Drawings, The National Electrical Code And Current Local Electricity Laws And Regulations. Any Deviation From The Approved Drawings Shall First Be Approved By The Electrical Inspectorate. 2) All Electrical Works Is To Be Done In A Neat And Acceptable Manner. 3) Provide 4-Wire Branch Circuits For All Dryers, Ranges And Cook Tops. 4) All Switches /

Receptacles Located In Bath Rooms To Have Ground Fault Protection. 5) No Mini Breakers Are To Be Installed 6) Provide Light And Receptacle In Attic For Servicing Equipment.

Questions or comments about this form? Contact charles.brown@gov.ky

Print Form

Different PDF Forms

Key takeaways

Here are some key takeaways regarding the completion and utilization of the Electrical Panel Schedule form:

  1. Understand the Purpose: The Electrical Panel Schedule is essential for tracking the electrical distribution within a facility.
  2. Accurate Information: Ensure that all information entered is accurate to prevent future issues with electrical load management.
  3. Labeling: Clearly label each circuit to facilitate easy identification and maintenance.
  4. Load Calculations: Calculate the load for each circuit to ensure it does not exceed the panel's capacity.
  5. Consistent Format: Use a consistent format throughout the schedule to enhance readability and usability.
  6. Update Regularly: Regularly update the schedule to reflect any changes in circuits or load requirements.
  7. Include All Circuits: Make sure to include all circuits, even those that may not be currently in use.
  8. Consult Professionals: When in doubt, consult with a licensed electrician for assistance in filling out the form.
  9. Accessibility: Ensure that the completed schedule is easily accessible to maintenance personnel and emergency responders.
  10. Documentation: Keep a copy of the schedule on file for reference during inspections or audits.

By following these key takeaways, the Electrical Panel Schedule can be a valuable tool for effective electrical management.